MINUTES FROM THE BOOSTER SUPERVISOR MEETING


DATE: 30-July-2002

Links: Minutes, PSB home page, PSB Supervisor ROTA 

PRESENT:   M. Benedikt, A. Blas, C. Carli, M. Chanel, K. Hanke, C. Hills, M. O'Neil, J. Sanchez, R. Scrivens.

Supervisor Linac:   K. Hanke M. O'Neil

Supervisor PSB:    M. Benedikt A. Blas


LINAC:

G64 power supply changed for the control of  LA1.QFN 46 on Friday 6h50. No real matter because the system was put in local mode in the meantime.

Wednesday 23 July 05:08 - Water pressure reducer failed in Linac 3. 500

liters of demin water lost causing the water station to switch off (stopping

also Linac 2). Further investigation shows that all the pressure reducers in

Linac 3 require attention before the ion run.

 


PSB:

ISO 1 GeV all OK except synchro

LHC pilot beam; tests ongoing


Miscellaneous:

Minutes by A. Blas.