PRESENT:   M. Benedikt, C. Carli, G.Cyvoct, F.Blas, K.Schindl, E. Jensen, J.L.Sanchez R. Scrivens, D. Kuchler, K.Hanke, G. Grawer.

Supervisor Linac G. Grawer K.Hanke

Supervisor PSB:  M.Chanel Cyvoct G.


LINAC:

.


PSB:

        We found BAX.SPEJSYNC missing on each ring. The RF repeater timing Q slot 3 and 4 broken. After switching to repeater R slot 7 &8, the synchro is OK (3h all users)

        Remplacement dune alimentation sur un crate pour le "beam control" des ions. (1h SFTION)

        Dificultes avec porte beton Isolde (2h30 ISOGPS)

        BR3.RTR ions changement module dans anneau

        Plusieurs reboot DPSBRF2 DPSBTINJ DPSBINRG

        Pertes R1 (100 mS / Inj) ( mise en evidence sur cycle 600 mS) tests en cours par Fredi

 


Miscellaneous:

 

Minutes by G.Cyvoct