PS-IS-118/RC

 

MINUTES OF THE PS-ISOLDE COORDINATION MEETING

held on 20 August 2002

 

 

Present:

D. Carminati, R. Catherall, A. Dorsival, G.J. Focker , T. Giles, G. Le Scornet, J. Lettry , S. Marzari, S. Meunier, T. Nilsson, F. Wenander

 

ISOLDE at URL: http://isolde.cern.ch

Consolidation projects at URL:

http://isolde-consolidation.web.cern.ch/isolde-consolidation/

PSMB meetings at URL:

http://cern.web.cern.ch/CERN/Divisions/PS/Meetings/PSMB.html

 

1. HRS:

Target #234 UC placed on separator yesterday. G.J. Focker reports that the electronic card of the Fixed Needle Beam Scanner is destroyed and will take 3-4 weeks to repair. The damage was due to a water leak in the air conditioning system of the laser barrack overhead.

The latter has been repaired temporarily.

 

2. Tunnel

      The target removed by hand from the robot last week will be put behind the lead shielding doors on Thursday at 14:00.

 

3. Radiation Protection

      The access door to the HT room should remain closed at all times. The CERN card should be used to enter and exit the room and the door should not be left open. The radiation levels in this room can be relatively high so a film badge should be worn at all times.

      All those doing radioactive implantations (either RABIT or in the experimental hall) are requested to follow the protocol in the TIS document PRP17.

 

 

 

 

Absences

T. Nilsson from 26.08 to 30.09 replaced by U. Koester

M. Lindroos from 19.08 to 23.08 replaced by J. Lettry

J. Schipper from 10.08 to 01.09

 

Next meeting:

Tuesday 27 August 2002 at 11.00 in the EP Conference Room A, building

304-1-001.