![]() |
Proton Synchrotron Division |
The objectives for the project are i) to bring the level of radiation safety to a level compatible with European legislation and ii) to consolidate the facility so that the required number of shifts per year are assured. The first part will require that a radioactive laboratory of class A in building 179 is created for all work on contaminated targets and front-ends, and that a radioactive laboratory of class C is created in building 170 for the ISOLDE experiments. The second objective requires a number of actions in the target workshop, at the separators and in the experimental hall, all of which have been identified as areas in need of consolidation.
|
Project Leader |
M. Lindroos | PS/OP |
| Deputy Project Leader | J. Lettry | PS/PP |
| High Resolution Separator OP | T. Giles | PS/OP |
| ISOLDE Control System | F. Locci | PS/CO |
| G. Mornacchi | PS/CO | |
| ISOLDE Instrumentation | G.J. Focker | PS/BD |
| U. Raich | PS/BD | |
| ISOLDE Laser Ion Source | U. Koester | EP/IS |
| ISOLDE Power Supplies | J.P. Royer | PS/PO |
| ISOLDE Separator Front-End | S. Marzari | PS/PP |
| ISOLDE Tape Station | U. Raich | PS/BD |
| Noble Gas Trap | E. Mahner | LHC/VAC |
| Radioactive Laboratory Class A | R. Catherall | PS/PP |
| Radioactive Laboratory Class C | U. Georg | PS/OP |
| Secondary Beam Transport | U. Georg | PS/OP |
| Target Manufacturing | J. Lettry | PS/PP |
| Target Robots | R. Catherall | PS/PP |
| Secretary | E. Durieu-Thiry | PS/DR |
sln 31 July, 2002